The first few months of 2021 were a busy time for us as we renovated and upgraded 2 of 4 of our vacation homes. When there’s a break in the schedule, there are 2 options. Wait or get to work. It’s more our style to get to work. And boy are we glad that we did!
Tipsy Topsail Renovations
We started with a walk through of Tipsy Topsail๐น. Admittedly, there were a few items in the home that needed a refresh. From structural needs like a ๐ก new roof, to cosmetic wishes like new ๐๏ธ furniture and paint, Tipsy Topsail received the attention it needed and now is fresh and ready to host guests again!
Kitchen Master Bath Master Bath View from Front Porch
Sound Move Renovations
Our Sound Move property was originally a duplex with 2 separate living sides. But over the last few years, we started noticing more families were booking both sides together. ๐จ๐ฉ๐ง๐ฆ This pattern got us thinking, "How could we make the space better for larger groups?"
Sound Move Dividing Wall Removed
After designing the new layout, we got to work on the changes. ๐จ We found it best to open up the main level to create a larger kitchen from the two small ones. Additionally the dining space was extended, making room for a coffee/wine bar. โ๐ท New furniture, flooring, and paint wrapped up the project. ๐จ
This single space now ๐๏ธ sleeps 13-19, has ๐ 6.5 baths, 2 hot tubs, ๐1 private salt water pool, and ๐ฅฉ 2 outdoor grills.
Our hope for Sound Move is that large families will have plenty of ๐งกconnected๐งก space to make memories!